GKN Aerospace

Project Overview

This project was an addition to the existing GKN Composite Parts Manufacturing Facility for the aerospace industry. Construction included sitework, spread foundations, concrete slab-on grade, conventional steel framing, insulated metal wall panels and modified bitumen roofing. The facility includes a 20,000 square feet clean room and was fully conditioned. Also, installed at the facility are several equipment foundations including autoclaves, nitrogen plant and five-axis cutting machine.

Client

GKN Aerospace

Architect

Goodwyn, Mills & Cawood Montgomery, Alabama

Project Duration

9 Months

Project Size

Manufacturing Facility Addition: 120,000 SF

Components

  • Conventional Steel Framing
  • Insulated Metal Wall Panels
  • Modified Bitumen Roofing
  • Clean Rooms
  • Equipment Foundations

More Projects

JESCO commercial construction company

RSA Judicial Office Building

This new office building is a twelve-story, 400,000 square foot facility. The building encapsulates the historic Alabama Supreme Court Building. The structure

JESCO industrial construction company

Norbord

This project, located near Guntown, Mississippi, was constructed for Norbord, Inc. Norbord is a world recognized leader in the manufacturing of Oriented

JESCO plant manufacturing engineering

Caterpillar – Oxford

JESCO Design / Build team completed the original design and construction of the 180,000 square feet High Performance Extrusions Plant in July