This project was an addition to the existing GKN Composite Parts Manufacturing Facility for the aerospace industry. Construction included sitework, spread foundations, concrete slab-on grade, conventional steel framing, insulated metal wall panels and modified bitumen roofing. The facility includes a 20,000 square feet clean room and was fully conditioned. Also, installed at the facility are several equipment foundations including autoclaves, nitrogen plant and five-axis cutting machine.
RSA Judicial Office Building
This new office building is a twelve-story, 400,000 square foot facility. The building encapsulates the historic Alabama Supreme Court Building. The structure