USA’s Hancock Whitney Stadium is a division I stadium that will seat 25,000 people. The Jaguars compete in the Sunbelt Conference. JESCO built the Core & Shell of the Operations building. JESCO self-preformed all pile caps and grade beams, along with slab on grade and slab on deck of each level. JESCO also self-preformed all brick and cast stone. JESCO poured the concrete and sister company Ellis Steel fabricated the galvanized steel. JESCO also poured the lower slab on grade vomitory concrete where fans will see the football players come running onto the field on game day from the locker rooms of the operations building which was built by JESCO. Sister Company Ellis Steel also fabricated the Videoboard steel in the South Endzone. The videoboard is one of the largest videoboards and speaker system in the Sunbelt Conference with two pyrotechnics chambers for fireworks. JESCO self-preformed all the hardscape concrete areas. This includes the sidewalk and handicap parking in the North parking lot around the Operations building along with three concrete paved entrances along the North and a large dumpster pad and truck dock pad for the TV broadcast companies. Slab on grade entrances to the stadium on the East & West sides of the stadium with the East side having decorative steps between the entrance portals.

Client

University of South Alabama

Project Size

  • Division I Football Stadium - 25,000 seats
  • Four stories housing locker rooms, offices, and viewing areas

Components

  • Curtain glass walls
  • Handicapped access seating
  • Six levels of standing terrace
  • Upper bowl aluminum seating
  • Lower bowl concrete seating
  • Pyrotechnics chambers
  • Videoboard

More Projects

JESCO commercial construction company

RSA Judicial Office Building

This new office building is a twelve-story, 400,000 square foot facility. The building encapsulates the historic Alabama Supreme Court Building. The structure

JESCO industrial construction company

Norbord

This project, located near Guntown, Mississippi, was constructed for Norbord, Inc. Norbord is a world recognized leader in the manufacturing of Oriented

JESCO plant manufacturing engineering

Caterpillar – Oxford

JESCO Design / Build team completed the original design and construction of the 180,000 square feet High Performance Extrusions Plant in July