Mueller Brass

Project Overview

Since the 1970s, Mueller Brass Company has been a long time customer of JESCO’s and together we have completed numerous additions including the original tube mill facility in Fulton, Mississippi. This 402,000 square feet facility utilized heavy conventional structural steel framing and eight to twelve inch floor slabs to accommodate heavy wheel loading. The building also consists of eighteen feet concrete tilt wall panels with metal siding above and built-up roofing (pitched to drains at the eaves).

The traditional building delivery system used for the Mueller Brass projects has been Design / Build. This approach has well served this partnership throughout the years by reducing the delivery schedule and thereby reducing disruption of processes.

JESCO’s Millwright Division performed the installation of the equipment in the original facility, which included horizontal extrusion press, billet casting, draw benches, draw blocks, finishing machines, annealing furnaces and turn machines. JESCO Millwright, also installed much of the original equipment in the fittings facility and has performed general maintenance work for this facility on a ongoing basis.

Client

Mueller Copper Tube Company

Architect

JESCO Design / Build Fulton, Mississippi

Project Size

Copper Tube Mill Manufacturing and Distribution Facility: 402,000 SF

Components

  • Convention Steel Structure
  • Extra Thick Concrete Floors
  • Tilt Panels and Metal Siding Exterior
  • Four Ply Built Up Roof
  • Equipment Installation

More Projects

JESCO commercial construction company

RSA Judicial Office Building

This new office building is a twelve-story, 400,000 square foot facility. The building encapsulates the historic Alabama Supreme Court Building. The structure

JESCO industrial construction company

Norbord

This project, located near Guntown, Mississippi, was constructed for Norbord, Inc. Norbord is a world recognized leader in the manufacturing of Oriented

JESCO plant manufacturing engineering

Caterpillar – Oxford

JESCO Design / Build team completed the original design and construction of the 180,000 square feet High Performance Extrusions Plant in July