Volvo Cars America

Project Overview

Volvo Car US Operations, Inc.’s first manufacturing facility in the United States will be the global production home of all the new S60 Sedans. The new facility will create approximately 2,000 direct jobs and produce 100,000 cars per year. American built S60’s will be exported around the world through the Port of Charleston.

JESCO’s Mechanical-Electrical Division worked with other units of The Yates Companies and our design partner Albert Kahn to design and construct the major buildings for the grassroots Volvo Cars America new assembly plant outside Charleston, SC. The Yates Companies total Scope of Work was the Body Shop, Assembly Building, Central Energy Plant, Administrative Office Building, additional small ancillary buildings and the Site Main Distribution Trestle. The total square footage constructed was 2,300,000 and was completed from design start to substantial completion in 22 months.

The total energy plant capacity is 7,500 tons cooling, 12,000,000 BTUH Heating Water (for paint shop) and 4,800 SCFM of compressed air. Body Shop, Assembly Building and Administrative Office are all heated by gas fire units (combination with air conditioning).

Client

Volvo Cars America

Architect

Albert Kahn Associates

Project Duration

22 Months

Project Size

2,300,000, SF 1,600 Acres

Components

  • 7,500 tons cooling
  • 12,000,000 BTUH heating water (PaintShop)
  • 4,800 SCFM of compressed air
  • Body Shop, AssemblyBuilding and Administrative Office heated by gas fire units (combination with air conditioning
  • Pursuing Leed Gold Certification

More Projects

JESCO commercial construction company

RSA Judicial Office Building

This new office building is a twelve-story, 400,000 square foot facility. The building encapsulates the historic Alabama Supreme Court Building. The structure

JESCO industrial construction company

Norbord

This project, located near Guntown, Mississippi, was constructed for Norbord, Inc. Norbord is a world recognized leader in the manufacturing of Oriented

JESCO plant manufacturing engineering

Caterpillar – Oxford

JESCO Design / Build team completed the original design and construction of the 180,000 square feet High Performance Extrusions Plant in July