A fully integrated steel pipe manufacturing complex delivered through a multi-phase design-build approach

Project Overview

JESCO provided turnkey design-build services for Lakeside Steel Alabama’s advanced steel pipe manufacturing campus in Thomasville, Alabama, delivering a fully integrated production environment across two major phases. Phase I established a 65,000 SF pipe casing plant featuring clear-span pre-engineered construction, overhead bridge cranes, and critical process equipment installations including an uncoiler, accumulator, and hydrotester. Phase II added a 55,000 SF pipe finishing plant, supporting threading, heat-treating, upsetting, and inspection operations to enable end-to-end steel pipe fabrication on-site. The project also included a 15-acre stone laydown yard and a 700-linear-foot rail spur, with JESCO’s in-house teams handling civil, structural, mechanical, electrical, and equipment installation to create a production-ready facility tailored to Lakeside Steel’s operational goals.

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities

65,000 SF pipe casing plant with clear-span construction and overhead cranes

15-acre stone laydown yard and 700-foot rail spur for streamlined material handling

15-acre stone laydown yard and 700-foot rail spur for streamlined material handling

Data Point - Callout - Brief Summary

Project Duration

Phase I: 12 Months
Phase II: 12 Months

Project Scope

This distribution center significantly enhances Mercedes-Benz’s parts logistics network in North America, combining high-volume storage, precision inventory management, and efficient loading/unloading systems in a single, fully integrated facility.
Impact
Challenges and Solutions

JESCO’s multidisciplinary delivery allowed for simultaneous design and construction of specialized MEP and foundation systems tailored to complex pipe manufacturing processes. Careful planning of the site layout, equipment installation, and logistics infrastructure enabled seamless integration of both phases into one cohesive operation.
JESCO’s self-performed work across key scopes, structure, utilities, and equipment ensured precision, accountability, and speed, providing Lakeside Steel with a high-performance industrial facility built for long-term operational success.

Challenges
& Solution

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries,

Challenges

Solution

OVERARCHING
key point

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's s

OVERARCHING
key point
OVERARCHING
key point
OVERARCHING
key point

Browse Project Gallery

Testimonials

Roll Form Group
Let’s build a better system together.