JESCO

Coahoma Electric Power Association

Lyon, Mississippi

A full-service campus supporting CEPA’s efforts across rural North Mississippi

Project Overview

To better serve its seven-county rural coverage area, Coahoma Electric Power Association (CEPA) relocated all business and field operations to a new, 34,850 SF purpose-built campus in Lyon, Mississippi. JESCO delivered the project through a full design-build approach, managing scope, design coordination, and construction across three buildings and substantial sitework.

The campus includes a 16,000 SF conventional steel office building for engineering, operations, and public interaction, including a Command Center for outage response. A 14,000 SF pre-engineered metal warehouse provides secure space for vehicles, boats, tools, and materials. A separate 4,850 SF pre-engineered maintenance shop is equipped with a truck exhaust system and wash bay for fleet servicing.

Extensive concrete paving and staging areas complete the site, enabling CEPA to deploy resources quickly and effectively in response to community needs.

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities

34,850 SF purpose-built campus

Full design-build delivery

Command Center for operations

Secure warehouse and maintenance

Data Point - Callout - Brief Summary

Project Duration

Project Duration: 15 months

Project Scope

This distribution center significantly enhances Mercedes-Benz’s parts logistics network in North America, combining high-volume storage, precision inventory management, and efficient loading/unloading systems in a single, fully integrated facility.
Impact
Challenges and Solutions

Supporting active electrical operations and logistics demanded high attention to functionality and durability. JESCO worked closely with CEPA to design efficient workflows within and between buildings while managing weather-sensitive sitework and specialty MEP requirements.

The new CEPA campus centralizes operations, enhances public accessibility, and strengthens the association’s capacity to maintain reliable electrical service across rural Mississippi for years to come.

Challenges
& Solution

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries,

Challenges

Solution

OVERARCHING
key point

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's s

OVERARCHING
key point
OVERARCHING
key point
OVERARCHING
key point

Browse Project Gallery

Testimonials

Specialty Orthopedic Group Tupelo
Let’s build a better system together.