Lyon, Mississippi
A full-service campus supporting CEPA’s efforts across rural North Mississippi
To better serve its seven-county rural coverage area, Coahoma Electric Power Association (CEPA) relocated all business and field operations to a new, 34,850 SF purpose-built campus in Lyon, Mississippi. JESCO delivered the project through a full design-build approach, managing scope, design coordination, and construction across three buildings and substantial sitework.
The campus includes a 16,000 SF conventional steel office building for engineering, operations, and public interaction, including a Command Center for outage response. A 14,000 SF pre-engineered metal warehouse provides secure space for vehicles, boats, tools, and materials. A separate 4,850 SF pre-engineered maintenance shop is equipped with a truck exhaust system and wash bay for fleet servicing.
Extensive concrete paving and staging areas complete the site, enabling CEPA to deploy resources quickly and effectively in response to community needs.

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities
1.5 million SF distribution facility
Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities
Employee Amenities
Advanced logistics capabilities
34,850 SF purpose-built campus
Full design-build delivery
Command Center for operations
Secure warehouse and maintenance

Data Point - Callout - Brief Summary

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Duration: 15 months
Supporting active electrical operations and logistics demanded high attention to functionality and durability. JESCO worked closely with CEPA to design efficient workflows within and between buildings while managing weather-sensitive sitework and specialty MEP requirements.
The new CEPA campus centralizes operations, enhances public accessibility, and strengthens the association’s capacity to maintain reliable electrical service across rural Mississippi for years to come.
Challenges & Solution
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries,
Challenges
Solution
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's s

It's just been a
pleasure to work with the JESCO team, all the way around.,"

We've been fortunate
enough to work with JESCO and partner up with them. They've been very responsive to our changes. They pick up the phone, they answer, they're quick to respond.,"

We've built a true
partnership with JESCO, we identified that they recognized the quality of our company and our product as an important aspect, and incorporated that into the construction of this concept.,"

What I can say is
working with JESCO, I've never felt that sort of collaboration and team work, and that solutions-oriented type of approach that we have with JESCO.,"