Project Overview

JESCO constructed two major additions for Montgomery Cancer Center, a Baptist Health facility in Montgomery, Alabama. The highlight of this work is a 2,700 SF radiation oncology bunker housing a Varian HE 21 Clinac Linear Accelerator, completed with advanced shielding and precision infrastructure. The facility expansion supports state-of-the-art cancer treatment with dedicated rooms for radiotherapy, control systems, and supporting equipment.

This specialized medical environment required complex structural systems, radiation shielding, and seamless MEP coordination. JESCO delivered the project with a high level of technical accuracy, ensuring patient safety and equipment performance in a mission-critical healthcare setting.

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities

2,700 SF state-of-the-art facility expansion supporting modern cancer treatment

Advanced radiation shielding ensuring patient and staff safety

Complex structural and MEP coordination for mission-critical operations

Data Point - Callout - Brief Summary

Project Duration

Project Duration: 9 months

Project Scope

This distribution center significantly enhances Mercedes-Benz’s parts logistics network in North America, combining high-volume storage, precision inventory management, and efficient loading/unloading systems in a single, fully integrated facility.
Impact
Challenges and Solutions

Radiation shielding and medical infrastructure integration demanded absolute precision. JESCO installed a 1,400-lb Nelco Neutron Shielding Door and coordinated early with equipment vendors (Varian and Brainlab) to ensure proper installation and system readiness. Structural work, particularly the deep drilled piers and 4-ft concrete walls, was executed with careful engineering and phasing to stay on schedule.

Challenges
& Solution

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries,

Challenges

Solution

OVERARCHING
key point

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's s

OVERARCHING
key point
OVERARCHING
key point
OVERARCHING
key point

Browse Project Gallery

Testimonials

Southern Union Community College
Let’s build a better system together.