JESCO, Inc. partnered with Roll Form Group (USA), Inc. to deliver a 210,000-square-foot sheet piling and highway guardrail manufacturing facility at Yellow Creek Port in Iuka, Mississippi. Completed in just 11 months using a streamlined design-build approach, the project maximized efficiency and minimized lead times. The facility features 190,000 SF of manufacturing space to accommodate heavy-duty equipment and process lines, along with 20,000 SF of office and employee support areas designed for functionality and comfort. Engineered for high-capacity production, the plant includes oversized equipment foundations, process trenches, uncoiler and flying saw foundations, looping pits up to 16 feet below floor level, four 35-ton overhead bridge cranes, and a fully integrated rail spur running directly through the building to support seamless inbound and outbound logistics.