JESCO, Inc. delivered a 110,000 SF expansion to the fully operational International Motors Big Bore Diesels (formerly Navistar) manufacturing facility while maintaining 100% production capacity throughout construction. The project was carefully staged with dust barricades and a temporary demising wall to fully isolate work areas from active operations.
The addition was seamlessly tied into the existing structure, with construction systems and utility infrastructure integrated to support ongoing and future production demands.