Point Clear, Alabama
Multi-million dollar renovation while fully operational
Located on the Eastern Shore of Mobile Bay, JESCO completed a renovation of The Grand Hotel as part of its transition from a Marriott property to the Autograph Collection. The comprehensive project encompassed full upgrades and remodels of all 405 guestrooms, the conference center, spa, restaurants, pools, lounge, and back-of-house areas. The renovation also included multiple premium suites, including the Honeymoon, Presidential, and Governor Suites. Remarkably, The Grand Hotel remained fully operational throughout the entire renovation, even as critical infrastructure systems were replaced. Work was strategically scheduled during the “off season” over two consecutive years, with planning for each upcoming phase continuing during seasonal downtime. Point Clear Holdings, the property owner, is a valued repeat client, this marks JESCO’s fourth major renovation of The Grand Hotel.

1.5 million SF distribution facility

Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities

Employee Amenities

Advanced logistics capabilities
1.5 million SF distribution facility
Floor storage (430,000 SF) & Rack storage (450,000 SF) Employee Amenities Advanced logistics capabilities
Employee Amenities
Advanced logistics capabilities
Full-property renovation transitioning the hotel to the Autograph Collection
Upgrades across all 405 guestrooms and key amenities
Premium suite enhancements featuring Honeymoon, Presidential, and Governor Suites
Renovation completed while fully operational over two consecutive off-seasons

Data Point - Callout - Brief Summary

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Duration: 24 months
Renovating a fully operational resort required meticulous planning to minimize disruptions to guests while critical infrastructure systems were replaced. Work had to be strategically scheduled during off-seasons over two consecutive years, with careful coordination for each upcoming phase during seasonal downtime. Maintaining high-quality service and safety standards throughout the entire project added complexity to every aspect of construction and renovation.
Challenges & Solution
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries,
Challenges
Solution
Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's s

It's just been a
pleasure to work with the JESCO team, all the way around.,"

We've been fortunate
enough to work with JESCO and partner up with them. They've been very responsive to our changes. They pick up the phone, they answer, they're quick to respond.,"

We've built a true
partnership with JESCO, we identified that they recognized the quality of our company and our product as an important aspect, and incorporated that into the construction of this concept.,"

What I can say is
working with JESCO, I've never felt that sort of collaboration and team work, and that solutions-oriented type of approach that we have with JESCO.,"